SEC Beijing Zhongfa Baiwang will build a mechanical multi-level parking

SEC Beijing Zhongfa Baiwang will build a mechanical multi-level parking

Aug 27th, 2021

During peak hours, the shopping center lacks parking spaces. Driving in search of parking spaces or  waiting in line in front of a parking gate leads to congestion on side roads. Haidian will add  self-propelled 3D parking equipment this year. Just go shopping at  Beijing Zhongfa  Baiwang Mall.  You don't have to worry about the "difficult parking" problem.


The reporter learned from Malianwa Street that the construction of an automated three-dimensional parking lot at Beijing Zhongfa Baiwang will be completed by the end of October this  year.


Beijing Zhongfa Baiwang Shopping Center is located at 18, Yuanmingyuan West Road. It is a large commercial center in the Malianwa area. The surrounding businesses, schools and communities arerelatively concentrated. During peak shopping times, due to the high traffic flow and limited parkingspaces, the phenomenon of accidental occupation of roads and parking lots is noticeable, which leads to congestion on nearby roads.


In order to increase the supply of parking spaces in the area and solve the problem of disorderly parking on adjacent roads, Gao Qi, manager of the administration department of Baiwang Shopping 

Center, proposed to build 3D parking spaces up to Malianwa Street in early April 2019. It is planned toconvert the surface parking area of about 2040m in the south of the shopping center into multilevel mechanical parking in order to reduce traffic load and standardize parking procedures.


What is an automatic multi-level parking system?


To reduce the area occupied by urban parking, mechanical parking lots are used, constructed of steel  structure or steel structure plus concrete structure that develops in the air and goes deep into the  ground.


The facade of the multi-level parking building in the spectacular drawing is gray  and white,  the  parking equipment occupies six levels, the building area is 12,070 square meters, 258 parking spaces

can be built. In addition to over 100 underground parking spaces, about 400 parking spaces are open to residents, which can effectively reduce the traffic load on nearby roads.


It is understood that for the convenience of the population, two elevators will be installed in the  self-propelled automatic parking equipment, and an intelligent  control mode will be adopted.  When parking, citizens can enter the vehicle number on the smart screen to locate the vehicle in the  parking system. They can also use electronic payments to reduce the waiting time when leaving the site. The remaining number of parking spaces will also be shared with the traffic management department.



At the same time, in order to regulate the parking order on the roads and solve the problem of accidental parking on adjacent roads, the streets under the jurisdiction must organize and coordinate 

to make full use of the parking space resources after the reconstruction of the mechanical multi-level parking in Baiwang Shopping Center, the implementation  phased parking and signing  agreements with residents who need parking in the vicinity of Lanyuan and other localities in order to enjoy discounted parking prices.


The measure will revitalize unused parking spaces at night at the Baiwang Mall, limit the phenomenon of erratic parking on nearby roads, and reduce the pressure associated with parking difficulties in the 

community.


GET FREE QUOTE

We will contact you within 24 hours.

+8615726220706