Trial Operation of the Three-Dimensional Garage of Cixi Guanghaiwei City Hospital

Trial Operation of the Three-Dimensional Garage of Cixi Guanghaiwei City Hospital

Jul 1st, 2021

8 entrances and exits, 7 floors of steel structure with vertical circulation, 96 t three dimensional parking spaces of City Hospital Guanhayvey opened for visitors.


With the rapid increase in the number of vehicle owners in cities, solving the problem of “parking is difficult and messy” has become a challenge for city managers. Guanghaiwei City Hospital is located in the center of Guanghaiwei City. Over the past 20 years since its foundation, the number of patients has increased tenfold, and the need for parking is growing day by day. However, the three-way ring road and one side of the water restrict regional expansion of the city hospital, and "the difficulty of parking the city hospital" has become a "big problem."



The total investment in the Guanghaiwei City Hospital 3D Parking Project, which is ranked among the top ten practical livelihood projects in Guanghaiwei City in 2020, is about RMB 5 million and covers an area of 280 square meters. Intelligent parking management system is fully installed, and the whole intelligent management process, realizing the breakthrough of "borrowing space from the top."



Six cars can be placed in one parking space, and the whole process of intelligent and automatic operation is “inductive door opening, parking space allocation according to the size and weight of the car, horizontal lifting, card retrieval”. It is worth mentioning that the 3D garage is scientifically designed so that the vehicle access time is less than 100 seconds and there is no queuing phenomenon, which greatly reduces hospital congestion and also saves the problem of wandering around looking for a car.



The relevant person in charge of Guanghai City Hospital said that infrared beams are installed around the parking space. When the vehicle is too wide, too long, parking is not standard, or pedestrians enter the parking space by mistake while lifting, the system will alarm and stop operation. In addition, personnel are also organized to operate the intelligent parking system, and dedicated personnel are specially assigned to perform onsite dispatching and vehicle unlocking management.


Huang, director of the city hospital, said that after the three-dimensional parking lot went live, people who came to the doctor praised her. Parking has become more convenient and safe, significantly reducing congestion in the surrounding residential areas and on the main Sanbeidon Road, and has truly brought convenience to the people in the area.




GET FREE QUOTE

We will contact you within 24 hours.

+8615705421960